0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Menghua Railway Han River Bridge

General Information

Other name(s): Haoji Railway Han River Bridge
Completion: 28 September 2019
Status: in use

Project Type

Location

Location: , ,
Crosses:
  • Han River
Coordinates: 32° 2' 7.69" N    112° 3' 44.07" E
Show coordinates on a map

Technical Information

Dimensions

total length 5 242 m
track gauge 1 435 mm

Materials

deck prestressed concrete
piers reinforced concrete

Participants

Currently there is no information available about persons or companies having participated in this project.

Relevant Web Sites

There currently are no relevant websites listed.

  • About this
    data sheet
  • Structure-ID
    20085914
  • Published on:
    20/05/2023
  • Last updated on:
    20/05/2023
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine