General Information
Other name(s): | Atchafalaya River Bridge |
---|---|
Beginning of works: | 1927 |
Completion: | 1 September 1929 |
Status: | in use |
Project Type
Function / usage: |
Railroad (railway) bridge |
---|---|
Material: |
Steel bridge |
Structure: |
Through truss bridge Vertical lift bridge Subdivided Warren truss bridge |
Support conditions: |
for registered users |
Material: |
Structurae Plus/Pro - Subscribe Now! |
Location
Location: |
Pointe Coupee Parish, Louisiana, USA Melville, Saint Landry Parish, Louisiana, USA |
---|---|
Crosses: |
|
Coordinates: | 30° 41' 26.90" N 91° 44' 2.30" W |
Technical Information
Dimensions
main span | 236.52 m | |
total length | 712.01 m | |
number of tracks | 1 | |
piers | number | 9 |
Materials
piers |
reinforced concrete
|
---|---|
towers |
steel
|
truss |
steel
|
abutments |
reinforced concrete
|
Participants
Design
- Ralph Modjeski (designer)
Relevant Web Sites
There currently are no relevant websites listed.
- About this
data sheet - Structure-ID
20080839 - Published on:
28/03/2021 - Last updated on:
28/03/2021