General Information
Name in local language: | Brücke über den Meidlinger Einschnitt |
---|---|
Beginning of works: | 2018 |
Completion: | 2020 |
Status: | under construction |
Project Type
Function / usage: |
Railroad (railway) bridge Bicycle and pedestrian bridge |
---|---|
Material: |
Structurae Plus/Pro - Subscribe Now! |
Structure: |
span 1: Tied-arch bridge |
Material: |
span 1: Steel bridge |
Construction method: |
span 1: Longitudinal launching |
Structure: |
span 2: Rigid frame bridge |
Material: |
span 2: Reinforced concrete bridge |
Location
Location: |
Vienna 12 (Meidling), Vienna, Austria |
---|---|
Coordinates: | 48° 10' 12.86" N 16° 19' 16.93" E |
Technical Information
Dimensions
number of tracks | 2 | |
abutment 30 | thickness | 1.95 m |
pier 20 | thickness | 3.60 m |
span 1 | ||
---|---|---|
span | 58.60 m | |
total width | 17.38 m | |
crossing angle | 77° (85.556 gon) | |
clear distance | 55.35 m | |
arches | width | 0.76 - 0.87 m |
rise | 12.51 m | |
thickness | 1.00 - 1.80 m | |
span 2 | ||
clearance | 5.00 - 5.71 m | |
total width | 16.62 m | |
crossing angle | 77° (85.556 gon) | |
clear distance | 20.10 m |
Materials
arches |
steel
|
---|---|
abutments |
reinforced concrete
|
pier |
reinforced concrete
|
tension tie |
steel
|
frame structure |
reinforced concrete
|
Participants
Owner
Design
Traffic engineering
Structural engineering
-
Baumann + Obholzer ZT-GmbH
- Anton Obholzer (structural engineer)
Checking engineering
- Wolfgang Augustin (checking engineer)
Co-contractor
Steel construction
Relevant Web Sites
There currently are no relevant websites listed.
Relevant Publications
- Eisenbahnbrücken in Österreich. Ein Streifzug durch die letzten Jahre. In: Brückenbau, v. 12, n. 1-2 ( 2020), pp. 76-81. (2020):
- About this
data sheet - Structure-ID
20079569 - Published on:
25/06/2020 - Last updated on:
25/06/2020