General Information
Status: | to be demolished |
---|
Project Type
Structure: |
Haunched girder bridge |
---|---|
Function / usage: |
Road bridge |
Material: |
Prestressed concrete bridge Structurae Plus/Pro - Subscribe Now! |
Location
Location: |
Meerhout, Antwerp, Flanders, Belgium |
---|---|
Crosses: |
Albert Canal (1939)
|
Coordinates: | 51° 6' 14.10" N 5° 4' 26.15" E |
Technical Information
Dimensions
main span | 61.00 m | |
span lengths | 30.50 m - 61.00 m - 30.50 m | |
number of spans | 3 | |
length of drop-in span | 32.00 m | |
deck | deck depth | max. 3.49 m |
deck width | 12.30 m |
Materials
deck |
prestressed concrete
|
---|---|
piers |
reinforced concrete
|
abutments |
reinforced concrete
|
Participants
Currently there is no information available about persons or companies having participated in this project.
Relevant Web Sites
There currently are no relevant websites listed.
Relevant Publications
- Puentes, carreteras elevadas y viaductos en hormigón parcialmente pretensado (clase 2a.). Metodo de cálculo, proyecto y ejecucion.. In: Hormigón y acero, v. 26, n. 116 (3rd Quarter 1975), pp. 19-50. (1975):
- About this
data sheet - Structure-ID
20076099 - Published on:
06/10/2018 - Last updated on:
06/10/2018