General Information
Status: | in use |
---|
Project Type
Structure: |
Girder bridge |
---|---|
Construction method: |
Incremental launching |
Function / usage: |
Motorway bridge / freeway bridge |
Material: |
Prestressed concrete bridge Structurae Plus/Pro - Subscribe Now! |
Location
Location: |
Mungyeong, North Gyeongsang, South Korea |
---|---|
Coordinates: | 36° 43' 17.08" N 128° 5' 52.56" E |
Technical Information
Dimensions
width | 2 x 12.6 m | |
length | 490.8 m | |
span lengths | 45 m - 8 x 50 m - 45 m | |
number of spans | 10 |
Materials
deck |
prestressed concrete
|
---|---|
piers |
reinforced concrete
|
abutments |
reinforced concrete
|
Participants
Owner
Structural engineering
Main contractor
Subcontractor
Prestressing
Relevant Web Sites
There currently are no relevant websites listed.
Relevant Publications
- Mawon 2nd Bridge post-tensioned using DYWIDAG Technology. Mawon 2nd Bridge, Munkyoung, Kyoungsangbukdo, South Korea. In: DSI Info, n. 12 ( 2003- 2004), pp. 11.
- About this
data sheet - Structure-ID
20034462 - Published on:
13/02/2008 - Last updated on:
05/02/2016