General Information
Other name(s): | CS 360 Project |
---|---|
Completion: | 1983 |
Status: | in use |
Project Type
Structure: |
Box girder bridge |
---|---|
Function / usage: |
Tramway, light or metro rail bridge |
Construction method: |
Precast segmental construction |
Material: |
Prestressed concrete bridge Structurae Plus/Pro - Subscribe Now! |
Location
Location: |
Atlanta, Fulton County, Georgia, USA |
---|---|
Connects to: |
MARTA CS 310 Bridge (1983)
|
Coordinates: | 33° 43' 59.69" N 84° 24' 49.45" W |
Technical Information
Dimensions
total length | 1 594 m | |
span lengths | 21.3 - 30.5 m | |
bridge surface | 14 713 m² | |
number of tracks | 2 | |
length of precast segments | 3 m | |
deck | deck depth | 2.1 m |
deck width | 9.3 m |
Materials
deck |
precast prestressed concrete
|
---|---|
piers |
reinforced concrete
|
Participants
Owner
Original design
Structural engineering
Contractor
Relevant Web Sites
There currently are no relevant websites listed.
Relevant Publications
- MARTA rapid transit bridges. In: PCI Journal, v. 30, n. 2 (March - April 1985), pp. 188-194.
- Métro d'Atlanta projets MARTA CS 360 et CN 480. Atlanta mass transit MARTA CS 360 and CN 480 projects. Presented at: 12ème Congrès de l'AIPC Vancouver 3-7.9.1984, pp. 187-195. (1984):
- About this
data sheet - Structure-ID
20004223 - Published on:
07/07/2002 - Last updated on:
27/03/2018