General Information
Status: | in use |
---|
Project Type
Structure: |
Box girder bridge |
---|---|
Function / usage: |
Road bridge |
Construction method: |
Incremental launching |
Material: |
Prestressed concrete bridge |
Location
Location: |
Lesotho |
---|---|
Crosses: |
|
Coordinates: | 29° 10' 55.43" S 28° 28' 54.93" E |
Technical Information
Dimensions
total length | 465.5 m | |
span lengths | 35.5 m - 8 x 49 m - 35.5 m | |
number of spans | 10 | |
deck | deck depth | 3.45 m |
deck width | 10.9 m |
Materials
superstructure |
prestressed concrete
|
---|
Participants
Relevant Web Sites
There currently are no relevant websites listed.
Relevant Publications
- VSL Incremental Launching and Post-Tensioning speed construction of South African bridge. In: VSL News, v. 2, n. 2 ( 1991), pp. 5. (1991):
- About this
data sheet - Structure-ID
20004054 - Published on:
01/07/2002 - Last updated on:
06/04/2016