General Information
Project Type
Structure: |
Box girder bridge |
---|---|
Function / usage: |
Road bridge |
Construction method: |
Balanced cantilever method |
Structure: |
Haunched girder bridge |
Material: |
Prestressed concrete bridge |
Location
Location: |
Singapore Tanjung Kupang, Johor, Malaysia |
---|---|
Coordinates: | 1° 21' 18.50" N 103° 37' 38.10" E |
Technical Information
Dimensions
main span | 165 m | |
total length | 2 x 1 919 m | |
span lengths of main bridge | 96 m - 165 m - 96m | |
deck | deck width | 2 x 15 m |
piles | diameter of bored piles | 1.5 m |
main bridge | ||
---|---|---|
length | 357 m |
Quantities
concrete volume | 54 000 m³ | |
prestressing steel | 2 650 t | |
reinforcing steel | 18 000 t | |
number of precast segments | 840 |
Materials
deck |
prestressed concrete
|
---|---|
deck of approach viaducts |
precast prestressed concrete
|
Chronology
October 1994 | Construction begins. |
---|---|
October 1997 | End of construction. |
Participants
Owner
Client
Design
Checking engineering
Contractor
Prestressing
Relevant Web Sites
Relevant Publications
- The Design of the Malaysia Singapore Second Crossing Bridge. Presented at: Australasian Bridge Conference, October 1998. (1998):
- Malaysia/Singapore Second Crossing Bridge. In: VSL News, v. 7, n. 2 ( 1996), pp. 11. (1996):
- About this
data sheet - Structure-ID
20004143 - Published on:
04/07/2002 - Last updated on:
05/02/2016