General Information
Project Type
| Structure: |
Box girder bridge Haunched girder bridge |
|---|---|
| Function / usage: |
Road bridge |
| Material: |
Prestressed concrete bridge |
| Construction method: |
Balanced cantilever method |
| Support conditions: |
for registered users |
| Deck levels: |
Structurae Plus/Pro - Subscribe Now! |
Location
| Location: |
Singapore Tanjung Kupang, Johor, Malaysia |
|---|---|
| Coordinates: | 1° 21' 18.50" N 103° 37' 38.10" E |
Technical Information
Dimensions
| main span | 165 m | |
| total length | 2 x 1 919 m | |
| span lengths of main bridge | 96 m - 165 m - 96m | |
| deck | deck width | 2 x 15 m |
| piles | diameter of bored piles | 1.5 m |
| main bridge | ||
|---|---|---|
| length | 357 m | |
Quantities
| concrete volume | 54 000 m³ | |
| prestressing steel | 2 650 t | |
| reinforcing steel | 18 000 t | |
| number of precast segments | 840 |
Materials
| deck |
prestressed concrete
|
|---|---|
| deck of approach viaducts |
precast prestressed concrete
|
Chronology
| October 1994 | Construction begins. |
|---|---|
| October 1997 | End of construction. |
Participants
Owner
Client
Design
Checking engineering
Contractor
Prestressing
Relevant Web Sites
Relevant Publications
- (1998): The Design of the Malaysia Singapore Second Crossing Bridge. Presented at: Australasian Bridge Conference, October 1998.
- (1996): Malaysia/Singapore Second Crossing Bridge. In: VSL News, v. 7, n. 2 ( 1996), pp. 11.
- About this
data sheet - Structure-ID
20004143 - Published on:
04/07/2002 - Last updated on:
05/02/2016