General Information

Other name(s): Chesapeake Bay Bridge-Tunnel (CBBT)
Beginning of works: 7 September 1960
Completion: 15 April 1964
Status: in use

Project Type

Function / usage: Road connection

Location

km Name
Show coordinates on a map

Technical Information

Dimensions

total length 28.4 km

Cost

cost of construction United States dollar 200 000 000

Chronology

7 September 1960

Beginning of construction.

15 April 1964

Bridge-Tunnel is opened for traffic (now used for northbound traffic).

1987

Investigations for a parallel crossing begin.

1995

Construction contract for the parallel crossing is awarded. Only the bridges are added, the tunnel will be widened at a later date.

16 June 1995

Construction begins on second crossing (southbound).

April 1999

Second crossing is completed.

19 April 1999

Opening of the second crossing (for southbound traffic).

Relevant Web Sites

  • About this
    data sheet
  • Structure-ID
    10000070
  • Published on:
    01/12/2001
  • Last updated on:
    28/05/2021
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine