General Information
Other name(s): | Chesapeake Bay Bridge-Tunnel (CBBT) |
---|---|
Beginning of works: | 7 September 1960 |
Completion: | 15 April 1964 |
Status: | in use |
Project Type
Function / usage: |
Road connection |
---|
Location
km | Name |
Technical Information
Dimensions
total length | 28.4 km |
Cost
cost of construction | United States dollar 200 000 000 |
Chronology
7 September 1960 | Beginning of construction. |
---|---|
15 April 1964 | Bridge-Tunnel is opened for traffic (now used for northbound traffic). |
1987 | Investigations for a parallel crossing begin. |
1995 | Construction contract for the parallel crossing is awarded. Only the bridges are added, the tunnel will be widened at a later date. |
16 June 1995 | Construction begins on second crossing (southbound). |
April 1999 | Second crossing is completed. |
19 April 1999 | Opening of the second crossing (for southbound traffic). |
Participants
Owner
northbound route
Design
Construction
- American Bridge Company
- Merritt, Chapman, Scott
- Peter Kiewit Sons', Inc.
- Raymond International
- Tidewater Construction Corp.
southbound route
Design
Co-contractor