General Information
Completion: | September 2003 |
---|---|
Status: | in use |
Project Type
Structure: |
Haunched girder bridge |
---|---|
Material: |
Prestressed concrete bridge |
Function / usage: |
Motorway bridge / freeway bridge |
Construction method: |
Balanced cantilever method |
Material: |
Structurae Plus/Pro - Subscribe Now! |
Location
Location: |
Alhandra, São João dos Montes e Calhandriz, Vila Franca da Xira, Lisbon, Portugal |
---|---|
Coordinates: | 38° 56' 7.89" N 9° 4' 24.25" W |
Technical Information
Dimensions
total length | 1 050.0 m | |
span lengths | 40.0 m - 60.0 m - 5 x 100.0 m - 60.0 m - 7 x 50.0 m - 40.0 m | |
number of spans | 16 | |
height above valley floor or water | 90 m | |
total width | 36.20 m | |
deck | deck depth | 2.50 - 5.50 m |
deck width | 2 x 18.0 m |
Quantities
concrete volume | 51 000 m³ | |
prestressing steel | 850 t | |
reinforcing steel | 6 100 t |
Cost
cost of construction | Euro 26 000 000 |
Materials
superstructure |
prestressed concrete
|
---|---|
piers |
reinforced concrete
|
abutments |
reinforced concrete
|
Participants
Design
Contractor
Prestressing
(role unknown)
Relevant Web Sites
There currently are no relevant websites listed.
Relevant Publications
- Loureiro Viaduct. In: Structural Engineering International, v. 15, n. 2 (May 2005), pp. 90-90. (2005):
- About this
data sheet - Structure-ID
20010109 - Published on:
02/09/2003 - Last updated on:
28/12/2019