General Information
Completion: | 2000 |
---|---|
Status: | in use |
Project Type
Structure: |
Unbraced tied-arch bridge |
---|---|
Function / usage: |
Road bridge |
Material: |
Steel bridge |
Location
Location: |
New Taipei City, Taiwan |
---|---|
Coordinates: | 25° 4' 23.81" N 121° 37' 49.29" E |
Technical Information
Dimensions
arch span | 68 m | |
deck | deck slab thickness | 150 mm |
Materials
deck |
composite steel-reinforced concrete
|
---|---|
arches |
steel
|
deck slab |
reinforced concrete
|
tension tie |
steel
|
Chronology
June 1999 | Design begins. |
---|---|
September 2000 | Construction completed. |
Participants
Owner
Design
- Ove Arup & Partners
- King-Le Chang (designer)
- Keith Chung (designer)
- Scott Hudgins (designer)
Structural engineering
Engineering
- Jen-Wie Li (engineer)
General contractor
Relevant Web Sites
There currently are no relevant websites listed.
Relevant Publications
- Lotus Pond Bridge, Taipei, Taiwan. In: The Arup Journal, v. 37, n. 1 ( 2002), pp. 53-55. (2002):
- About this
data sheet - Structure-ID
20003470 - Published on:
03/06/2002 - Last updated on:
05/02/2016