0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

General Information

Name in local language: Löcknitztalbrücke
Official designation: BW 21
Beginning of works: June 2014
Completion: 21 December 2015
Status: in use

Project Type

Location

Location: , , ,
Part of:
Carries: A 14 Motorway (Germany)
Coordinates: 53° 10' 5.86" N    11° 42' 58.04" E
Show coordinates on a map

Technical Information

Dimensions

total length 200.00 m
span lengths 23.75 m - 2 x 29 m - 34.50 m - 2 x 29 m - 25.75 m
deck width 2 x 14.10 m
number of spans 7
bridge surface 5 640 m²
deck girder depth 1.60 m
number of lanes 2 x 2
roadway / carriageway width 2 x 10.50 m

Quantities

deck concrete volume 4 880 m³
prestressing steel 166 t
reinforcing steel 604 t
substructure concrete volume 3 850 m³
reinforcing steel 338 t

Design Loads

design code(s) DIN EN 1991-2/NA

Cost

cost of construction ca. Euro 7 700 000

Materials

deck prestressed concrete
piers reinforced concrete
abutments reinforced concrete

Relevant Web Sites

There currently are no relevant websites listed.

Relevant Publications

  • Brücken und Tunnel der Bundesfernstraßen 2017. Bundesministerium für Verkehr und digitale Infrastruktur, Berlin (Germany), 2017, pp. 55-67.
  • Wellner, Sabine (2016): Chronik des Brückenbaus. In: Curbach, Manfred (2016): 26. Dresdner Brückenbausymposium. Institut für Massivbau, Technische Universität Dresden, Dresden (Germany), ISBN 978-3-86780-544-5, pp. 283-310.
  • About this
    data sheet
  • Structure-ID
    20074771
  • Published on:
    16/02/2018
  • Last updated on:
    06/04/2018
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine