General Information
Project Type
Structure: |
Single-cell box girder bridge |
---|---|
Function / usage: |
Road bridge |
Construction method: |
Precast segmental construction with temporary cable-stays |
Material: |
Prestressed concrete bridge |
Awards and Distinctions
1984 |
Award of Merit
for registered users |
---|
Location
Location: |
Grandfather Mountain, North Carolina, USA |
---|---|
Coordinates: | 36° 5' 36.25" N 81° 48' 47.05" W |
Technical Information
Dimensions
length | 378.87 m | |
span lengths | 30 m - 49.70 m - 3 x 55.00 m - 49.70 m - 30 m | |
number of spans | 7 | |
horizontal radius of curvature | min. 76 m | |
length of precast segments | 1.50 m - 2.70 m | |
deck | deck depth | 2.70 m |
deck width | 11.40 m | |
web thickness | 0.45 m | |
thickness of bottom flange | 0.30 m |
Cost
cost of construction | United States dollar 7 900 000 |
Materials
deck |
precast prestressed concrete
|
---|
Participants
Relevant Web Sites
There currently are no relevant websites listed.
Relevant Publications
- Design and Construction of Linn Cove Viaduct. In: PCI Journal, v. 30, n. 5 (September 1985), pp. 38-53. (1985):
- Joint Heating Allows Winter Construction on Linn Cove Viaduct. In: PCI Journal, v. 27, n. 5 (September 1982), pp. 120-130. (1982):
- Pont de Linn Cove (Caroline-du-Nord - USA). In: Bulletin annuel AFPC ( 1980- 1982), pp. 43-48.
- Pont de Linn Cove aux USA. Presented at: Technique française du Béton Précontraint, IXe Congrès de la FIP Stockholm 1982, pp. 70.
- About this
data sheet - Structure-ID
20004072 - Published on:
02/07/2002 - Last updated on:
23/01/2024