0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

General Information

Beginning of works: 18 August 2006
Completion: September 2010
Status: in use

Project Type

Construction method: Immersed tube method
Structure: Immersed tube tunnel
Function / usage: Road tunnel

Location

Location: , ,
Address: under river Shannon
Coordinates: 52° 39' 9.15" N    8° 40' 58.13" W
Coordinates: 52° 39' 25.52" N    8° 41' 20.18" W
Show coordinates on a map

Technical Information

Dimensions

length 675 m

Relevant Web Sites

Relevant Publications

  • About this
    data sheet
  • Structure-ID
    20036956
  • Published on:
    30/04/2008
  • Last updated on:
    13/11/2016
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine