0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

General Information

Official designation: BW 67-1
Beginning of works: March 2006
Completion: December 2008
Status: in use

Project Type

Location

Location: , , ,
Address: LIF 2
Crosses:
  • Autobahn A73
Part of:
Coordinates: 50° 9' 2.78" N    11° 1' 39.90" E
Show coordinates on a map

Technical Information

Dimensions

span 90.82 m
bridge surface 1 288 m²
deck width 10.50 m
piles diameter 1.20 m

Quantities

deck structural steel 330 t
concrete volume 540 m³
reinforcing steel 135 t
piles reinforcing steel 60 t
total length of piles 320 m
substructure concrete volume 1 322 m³
reinforcing steel 180 t

Design Loads

live load DIN FB 101

Cost

cost of construction Euro 3 570 000

Materials

truss steel tubes
deck slab reinforced concrete

Participants

Owner
Client
Design
Structural engineering
Consulting
Geotechnical/geological experts
Checking engineering
Contractor

Relevant Web Sites

There currently are no relevant websites listed.

Relevant Publications

  • About this
    data sheet
  • Structure-ID
    20043656
  • Published on:
    18/02/2009
  • Last updated on:
    05/04/2016
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine