0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

General Information

Name in local language: Liebknechtbrücke
Beginning of works: 22 August 1949
Completion: 29 April 1950
Status: in use

Project Type

Structure: Two-hinged rigid-frame bridge
Function / usage: Road bridge
Material: Steel bridge

Location

Location: , , ,
Address: Karl-Liebknecht-Straße
Crosses:
  • Spree River
Coordinates: 52° 31' 7.52" N    13° 24' 8.31" E
Show coordinates on a map

Technical Information

Dimensions

width 22.20 m
total length ca. 60 m
vertical navigation clearance 4.30 m

Materials

deck steel
portal legs steel

Participants

Currently there is no information available about persons or companies having participated in this project.

Relevant Web Sites

  • About this
    data sheet
  • Structure-ID
    20010055
  • Published on:
    30/08/2003
  • Last updated on:
    16/04/2020
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine