Name in local language: | Leutenbachtunnel |
---|---|
Beginning of works: | February 2005 |
Completion: | July 2009 |
Duration of works: | 42 months |
Status: | in use |
Project Type
Function / usage: |
Road tunnel |
---|---|
Construction method: |
Cut-and-cover method Conventional tunnelling |
Structure: |
Tunnel |
Location
Location: |
Winnenden, Rems-Murr-Kreis, Baden-Württemberg, Germany |
---|---|
Address: | B 14 |
Coordinates: | 48° 53' 1" N 9° 23' 43" E |
Technical Information
Dimensions
tunnel length | 1 080 m | |
length of cut-and-cover section | 371 m + 50 m | |
roadway / carriageway width | 7.50 m | |
number of tubes | 2 |
Quantities
volume of extracted material | 140 000 m³ + 133 000 m³ | |
reinforced concrete volume | 50 000 m³ | |
shotcrete | 15 500 m³ |
Cost
cost of construction | ca. Euro 50 000 000 |
Materials
tunnel structure |
reinforced concrete
|
---|---|
tunnel portals |
reinforced concrete
|
Participants
Owner
Client
Design
Structural engineering
Geotechnical/geological experts
Checking engineering
- Prof. Dr.-Ing. W. Wittke Beratende Ingenieure für Grundbau und Felsbau GmbH
-
Boll + Partner
- Jörg Münzner (checking engineer)
Co-contractor
Site supervision
Tunnel equipment
Relevant Web Sites
There currently are no relevant websites listed.
Relevant Publications
- Brücken und Tunnel der Bundesfernstraßen 2010. Bundesministerium für Verkehr, Bau und Stadtentwicklung, Berlin (Germany), pp. 131-144.
- Innovatives Abdichtungssystem in druckwasserdichter Ausführung des Tunnels Leutenbach. In: Geomechanik und Tunnelbau, v. 1, n. 5 ( 2008), pp. 519-522. (2008):
- Innovatives Montagesystem für die Abdichtung des Tunnels Leutenbach. In: Felsbau-Magazin, n. 1 ( 2008), pp. 18. (2008):
- About this
data sheet - Structure-ID
20018020 - Published on:
10/10/2005 - Last updated on:
28/05/2021