0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

General Information

Name in local language: Leutenbachtunnel
Beginning of works: February 2005
Completion: July 2009
Duration of works: 42 months
Status: in use

Project Type

Function / usage: Road tunnel
Construction method: Cut-and-cover method
Conventional tunnelling
Structure: Tunnel

Location

Location: , , ,
Address: B 14
Coordinates: 48° 53' 1" N    9° 23' 43" E
Show coordinates on a map

Technical Information

Dimensions

tunnel length 1 080 m
length of cut-and-cover section 371 m + 50 m
roadway / carriageway width 7.50 m
number of tubes 2

Quantities

volume of extracted material 140 000 m³ + 133 000 m³
reinforced concrete volume 50 000 m³
shotcrete 15 500 m³

Cost

cost of construction ca. Euro 50 000 000

Materials

tunnel structure reinforced concrete
tunnel portals reinforced concrete

Relevant Web Sites

There currently are no relevant websites listed.

Relevant Publications

  • About this
    data sheet
  • Structure-ID
    20018020
  • Published on:
    10/10/2005
  • Last updated on:
    28/05/2021
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine