• DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Leutenbach Tunnel

General Information

Name in local language: Leutenbachtunnel
Beginning of works: February 2005
Completion: July 2009
Duration of works: 42 months
Status: in use

Project Type

Structure: Tunnel
Function / usage: Road tunnel
Construction method: Cut-and-cover method
Conventional tunnelling

Location

Location: , , ,
Address: B 14
Coordinates: 48° 53' 1.00" N    9° 23' 43.00" E
Show coordinates on a map

Technical Information

Dimensions

tunnel length 1 080 m
length of cut-and-cover section 371 m + 50 m
roadway / carriageway width 7.50 m
number of tubes 2

Quantities

volume of extracted material 140 000 m³ + 133 000 m³
reinforced concrete volume 50 000 m³
shotcrete 15 500 m³

Cost

cost of construction ca. Euro 50 000 000

Materials

tunnel structure reinforced concrete
tunnel portals reinforced concrete

Advertisement

Relevant Web Sites

There currently are no relevant websites listed.

Relevant Publications

  • About this
    data sheet
  • Structure-ID
    20018020
  • Published on:
    10/10/2005
  • Last updated on:
    07/05/2020