• DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Leuke Viaduct

General Information

Name in local language: Talbrücke Leuketal
Beginning of works: 2003
Completion: 2005
Status: in use

Project Type

Structure: Girder bridge
Function / usage: Motorway bridge / freeway bridge
Material: Prestressed concrete bridge
Construction method: Incremental launching

Location

Location: , , ,
Part of:
Coordinates: 50° 33' 15.99" N    10° 43' 53.00" E
Show coordinates on a map

Technical Information

Dimensions

total length 218 m
span lengths 36.50 m - 45.00 m - 55.00 m - 45.00 m - 36.50 m
deck width 2 x 14.5 m
height above valley floor or water ca. 35 m
girder depth 3.75 m
total width 28.50 m

Cost

cost of construction Euro 5 700 000

Materials

deck prestressed concrete
piers reinforced concrete
abutments reinforced concrete

Advertisement

Relevant Web Sites

There currently are no relevant websites listed.

  • About this
    data sheet
  • Structure-ID
    20048925
  • Published on:
    03/11/2009
  • Last updated on:
    05/02/2018