General Information
Project Type
Function / usage: |
Motorway bridge / freeway bridge |
---|---|
Structure: |
Twin girder bridge |
Material: |
Steel bridge |
Location
Location: |
Avignon, Vaucluse (84), Provence-Alpes-Côte d'Azur, France Barbentane, Bouches-du-Rhône (13), Provence-Alpes-Côte d'Azur, France |
---|---|
Crosses: |
|
Coordinates: | 43° 55' 5" N 4° 47' 1" E |
Technical Information
Dimensions
width | 21 - 26 m | |
total length | 740 m | |
span lengths | 36 m - 60 m - 64 m - 80 m - 4 x 88 m - 64 m | |
number of spans | 9 | |
deck | deck slab thickness | 0.24 m |
piers | height | 4 - 12 m |
Quantities
deck | structural steel | 4 000 t |
concrete volume | 4 100 m³ | |
substructure | concrete volume | 7 500 m³ |
Cost
cost of construction (incl. taxes) | Euro 25 000 000 |
Materials
girders |
steel
|
---|
Participants
Owner's representative
Client
Architecture
Structural engineering
Checking engineering
Co-contractor
Civil works
Steel construction
Relevant Web Sites
Relevant Publications
- Coffrage sur-mesure sur le "pont" d'Avignon. In: BTP Magazine, n. 224 (November 2008), pp. 130-132. (2008):
- La construction de l'ouvrage aval de franchissement de la Durance. La liaison Est-Ouest d'Avignon. In: Ouvrages d'art, n. 62 (December 2009), pp. 8-20. (2009):
- La construction de l'ouvrage aval de franchissement de la Durance. La liaison Est-Ouest d'Avignon. In: Ouvrages d'art, n. 63 (March 2010), pp. 14-27. (2010):
- LEO A7/A9. Un nouveau pont sur la Durance. In: BTP Magazine, n. 224 (November 2008), pp. 102-104. (2008):
- La liaison Est-Ouest d'Avignon. Ou comment un ouvrage routier peut contribuer à valoriser l'environnement et améliorer la biodiversité. In: Ouvrages d'art, n. 59 (November 2008), pp. 20-29. (2008):
- About this
data sheet - Structure-ID
20027962 - Published on:
26/04/2007 - Last updated on:
05/02/2016