General Information
Project Type
Structure: |
Girder bridge |
---|---|
Function / usage: |
Motorway bridge / freeway bridge |
Construction method: |
Longitudinal launching |
Material: |
Steel-reinforced concrete composite bridge Structurae Plus/Pro - Subscribe Now! |
Location
Location: |
Saint-André, Savoie (73), Auvergne-Rhône-Alpes, France Freney, Savoie (73), Auvergne-Rhône-Alpes, France |
---|---|
Carries: |
|
Part of: | |
Coordinates: | 45° 11' 47.47" N 6° 37' 13.43" E |
Technical Information
Dimensions
total length | 207 m | |
span lengths | 49 m - 79 m - 47 m - 32 m | |
number of spans | 4 | |
deck | width | 18.2 m |
Materials
piers |
reinforced concrete
|
---|---|
deck slab |
reinforced concrete
|
abutments |
reinforced concrete
|
girders |
steel
|
Participants
Owner
Client
Architecture
- Charles Lavigne (architect)
Construction
- Presspali France (foundations)
Co-contractor
Steel construction
Relevant Web Sites
There currently are no relevant websites listed.
- About this
data sheet - Structure-ID
20004598 - Published on:
22/08/2002 - Last updated on:
20/05/2024