General Information
Project Type
Structure: |
Box girder bridge |
---|---|
Function / usage: |
Motorway bridge / freeway bridge |
Construction method: |
Incremental launching |
Material: |
Prestressed concrete bridge Structurae Plus/Pro - Subscribe Now! |
Location
Location: |
Münnerstadt, Bad Kissingen (Kreis), Bavaria, Germany |
---|---|
Carries: |
|
Part of: | |
Coordinates: | 50° 14' 52.15" N 10° 12' 55.22" E |
Technical Information
Dimensions
main span | 87 m | |
total length | 627 m | |
number of spans | 8 |
Materials
deck |
prestressed concrete
|
---|---|
piers |
reinforced concrete
|
Chronology
April 2002 | Construction of the foundations begins. |
---|
Participants
Owner
Client
Original design
Structural engineering
Checking engineering
- Köhler + Seitz Beraten und Planen GmbH
- Manfred Curbach (checking engineer)
Contractor
Prestressing
Concrete supplier
Reinforcing steel
Scaffolding
Relevant Web Sites
There currently are no relevant websites listed.
Relevant Publications
- Ahead of the game. In: Bridge Design & Engineering, v. 9, n. 31 (2nd Quarter 2003), pp. 38-40. (2003):
- About this
data sheet - Structure-ID
20010345 - Published on:
25/09/2003 - Last updated on:
05/02/2016