0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

General Information

Beginning of works: 2002
Completion: 2004
Status: in use

Project Type

Location

Location: , , ,
Carries:
  • Autoroute A71
Part of:
Coordinates: 50° 14' 52.15" N    10° 12' 55.22" E
Show coordinates on a map

Technical Information

Dimensions

main span 87 m
total length 627 m
number of spans 8

Materials

deck prestressed concrete
piers reinforced concrete

Chronology

April 2002

Construction of the foundations begins.

Relevant Web Sites

There currently are no relevant websites listed.

Relevant Publications

  • Beier, Hans-Jörg (2003): Ahead of the game. In: Bridge Design & Engineering, v. 9, n. 31 (2nd Quarter 2003), pp. 38-40.
  • About this
    data sheet
  • Structure-ID
    20010345
  • Published on:
    25/09/2003
  • Last updated on:
    05/02/2016
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine