0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

General Information

Beginning of works: 1997
Completion: 1999
Status: in use

Project Type

Structure: Tunnel
Function / usage: Noise reduction tunnel
Structure: Trough / U-shaped retaining structure

Location

Location: , , ,
For:
  • Autobahn A33
Part of:
Coordinates: 52° 6' 39.60" N    8° 10' 55.07" E
Coordinates: 52° 6' 55.69" N    8° 10' 48.97" E
Show coordinates on a map

Technical Information

Dimensions

total length 700 m
clear interior profile 2 x 11.00 m × 4.70 m
tunnel length 500 m
length of trough 76 m + 124 m

Quantities

concrete volume 40 000 m³
reinforcing steel 2 800 t
volume of extracted material 180 000 m³

Cost

cost of construction German Mark 50 000 000

Materials

trough reinforced concrete
girders precast reinforced concrete

Chronology

February 2001

Opening to traffic.

Relevant Web Sites

There currently are no relevant websites listed.

Relevant Publications

  • About this
    data sheet
  • Structure-ID
    20006049
  • Published on:
    08/10/2002
  • Last updated on:
    08/01/2015
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine