General Information
Name in local language: | Talbrücke Lanzendorf |
---|---|
Official designation: | BW 293a |
Beginning of works: | 1995 |
Completion: | 1997 |
Status: | in use |
Project Type
Structure: |
Single-cell box girder bridge |
---|---|
Function / usage: |
Motorway bridge / freeway bridge |
Construction method: |
Incremental launching |
Material: |
Prestressed concrete bridge |
Support conditions: |
for registered users |
Material: |
Structurae Plus/Pro - Subscribe Now! |
Location
Location: |
Lanzendorf, Himmelkron, Kulmbach (Kreis), Bavaria, Germany |
---|---|
Crosses: |
|
Carries: |
|
Part of: | |
Coordinates: | 50° 2' 32.88" N 11° 36' 50.81" E |
Technical Information
Dimensions
main span | 59 m | |
total length | 1 092.80 m | |
span lengths | 36.40 m - 41.00 m - 48.00 m - 14 x 59.00 m - 53.00 m - 48.00 m - 40.40 m | |
number of spans | 20 | |
bridge surface | 39 600 m² | |
height above valley floor or water | 32 m | |
web thickness | 0.25 m | |
deck | deck depth | 3.75 m |
deck width | 2 x 17.5 m | |
piers | number | 19 |
piles | diameter | 1.50 m |
Quantities
Rehabilitation | ||
---|---|---|
concrete volume | 2 400 m³ | |
reinforcing steel | 250 t |
Cost
cost of construction | German Mark 71 000 000 | |
Rehabilitation | ||
---|---|---|
cost of construction | Euro 20 100 000 |
Materials
superstructure |
prestressed concrete
|
---|---|
piers |
reinforced concrete
|
abutments |
reinforced concrete
|
Participants
Initial construction (1995-1997)
Owner
Client
Co-contractor
Rehabilitation (2019-2020)
Owner
Client
Design
Detailed design
Co-contractor
Relevant Web Sites
There currently are no relevant websites listed.
- About this
data sheet - Structure-ID
20003996 - Published on:
25/06/2002 - Last updated on:
27/06/2020