0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

General Information

Completion: 1889
Status: in use

Project Type

Structure: Cantilever truss bridge
Material: Steel bridge
Function / usage: Road bridge

Location

Location: ,
,
Crosses:
  • Indus River
Next to: Ayub Bridge (1962)
Coordinates: 27° 41' 37.42" N    68° 53' 18.71" E
Show coordinates on a map

Technical Information

Dimensions

main span 244 m

Materials

truss steel

Participants

Currently there is no information available about persons or companies having participated in this project.

Relevant Web Sites

Relevant Publications

  • About this
    data sheet
  • Structure-ID
    20007062
  • Published on:
    02/12/2002
  • Last updated on:
    20/11/2017
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine