General Information
Other name(s): | Indus River Bridge |
---|---|
Beginning of works: | November 1959 |
Completion: | May 1962 |
Status: | in use |
Project Type
Structure: |
Through arch bridge |
---|---|
Function / usage: |
Railroad (railway) bridge |
Material: |
Steel bridge |
Structure: |
Truss arch bridge |
Location
Location: |
Sukkur, Pakistan Rohri, Pakistan |
---|---|
Crosses: |
|
Next to: |
Landsdown Bridge (1889)
|
Coordinates: | 27° 41' 37.53" N 68° 53' 17.84" E |
Technical Information
Dimensions
main span | 245 m | |
total length | 310 m |
Materials
deck |
steel
|
---|---|
arch |
steel
|
Participants
Design
-
Robinson & Steinman
- David B. Steinman (designer)
Relevant Web Sites
- About this
data sheet - Structure-ID
20002279 - Published on:
06/03/2007 - Last updated on:
20/11/2017