General Information
Project Type
Function / usage: |
Road bridge |
---|---|
Structure: |
Vertical lift bridge |
Material: |
Steel bridge |
Structure: |
U-shaped girder bridge |
Location
Location: |
Klosters-Serneus, Grisons, Switzerland |
---|---|
Crosses: |
|
Coordinates: | 46° 51' 58.22" N 9° 52' 55.91" E |
Technical Information
Dimensions
span | 22.50 m | |
deck slab | thickness | 40 cm |
piles | diameter | 1.10 m |
number | 4 |
Quantities
piles | total length of piles | 60 m |
Cost
cost of construction | Swiss Franc 2 200 000 |
Materials
piles |
reinforced concrete
|
---|---|
deck slab |
reinforced concrete
|
abutments |
reinforced concrete
|
girders |
steel
|
Participants
Owner
Design
-
Edy Toscano AG
- Roger Angehrn (designer)
Main contractor
Mechanical & electrical engineering
Relevant Web Sites
There currently are no relevant websites listed.
- About this
data sheet - Structure-ID
20034355 - Published on:
10/02/2008 - Last updated on:
23/08/2021