0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

General Information

Beginning of works: 1955
Completion: 1956
Status: in use

Project Type

Awards and Distinctions

Location

Location: , , ,
, , ,
Crosses:
  • Lake Pontchartrain
Next to: Lake Pontchartrain Causeway (1969)
Coordinates: 30° 21' 50.79" N    90° 5' 37.70" W
Coordinates: 30° 1' 17.14" N    90° 9' 14.27" W
Show coordinates on a map

Technical Information

Dimensions

total length 38 km
span lengths 17 m

Cost

cost of construction United States dollar 30 700 000

Materials

deck precast concrete

Participants

Design
Contractor
Repairs (2005)
Contractor

Relevant Web Sites

Relevant Publications

  • About this
    data sheet
  • Structure-ID
    20002287
  • Published on:
    11/11/2001
  • Last updated on:
    05/05/2024
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine