General Information
Project Type
Structure: |
Box girder bridge |
---|---|
Function / usage: |
Motorway bridge / freeway bridge |
Construction method: |
Balanced cantilever method |
Structure: |
Haunched girder bridge |
Material: |
Prestressed concrete bridge Structurae Plus/Pro - Subscribe Now! |
Location
Location: |
Merlines, Corrèze (19), Nouvelle-Aquitaine, France |
---|---|
Carries: |
|
Part of: | |
Near: |
Bergères Viaduct
|
Coordinates: | 45° 36' 45.83" N 2° 26' 38.96" E |
Technical Information
Dimensions
main span | 150 m | |
total length | 420 m | |
pier height | max. 60 m | |
deck | deck width | 19 m |
Cost
cost of construction | French Franc 105 000 000 |
Materials
deck |
prestressed concrete
|
---|---|
piers |
reinforced concrete
|
Participants
Owner
Client
Architecture
- Charles Lavigne (architect)
-
Architecture et Ouvrages d'art
- Alain Montois (architect)
Structural engineering
Construction
Formwork
Form travelers
Relevant Web Sites
There currently are no relevant websites listed.
Relevant Publications
- L'autoroute sous l'emprise du paysage. In: Construction moderne ( 2000), pp. 8-16. (2000):
- La Barricade, une travée centrale de 150 m. In: Travaux, n. 768 (October 2000).
- Le viaduc de la Barricade sur l'autoroute A89. The Barricade viaduct on the A89 motorway. Presented at: First fib Congress, 13-19.10.2002, Osaka, Japan, pp. 41-42. (2002):
- About this
data sheet - Structure-ID
20002523 - Published on:
15/12/2001 - Last updated on:
05/02/2016