0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

General Information

Other name(s): Kurt-Schumacher-Brücke
Beginning of works: 1969
Completion: 28 June 1972
Status: in use

Project Type

Location

Location: , ,
, ,
Crosses:
  • Rhine River
Coordinates: 49° 29' 22.87" N    8° 26' 44.70" E
Show coordinates on a map

Technical Information

Dimensions

main bridge
total length 433.45 m
span lengths 287.640 m - 60.160 m - 65.000 m
number of spans 3
deck deck depth 4.50 m
deck width 36.90 m
pylon pylon height 77.93 m

Quantities

main bridge
deck structural steel 4 672.2 t
pylon structural steel 845.5 t
stay cables steel for cable-stays 655.2 t

Materials

cables steel
pylon steel
deck of main bridge steel
deck of approach viaducts prestressed concrete

Participants

Initial construction (1969-1972)
Owner
Design
Structural engineering
Checking engineering
General contractor
Steel construction
Concrete construction

Relevant Web Sites

There currently are no relevant websites listed.

Relevant Publications

More publications...
  • About this
    data sheet
  • Structure-ID
    20001096
  • Published on:
    07/10/2000
  • Last updated on:
    05/02/2016
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine