General Information
Name in local language: | Крюківський міст |
---|---|
Other name(s): | Kremenchuk Bridge |
Beginning of works: | 1947 |
Completion: | 21 December 1949 |
Status: | in use |
Project Type
Structure: |
Vertical lift bridge |
---|---|
Material: |
Steel bridge |
Support conditions: |
for registered users |
Structure: |
Subdivided Warren truss bridge |
Material: |
Structurae Plus/Pro - Subscribe Now! |
Structure: |
approach viaducts: Deck truss bridge |
Function / usage: |
upper deck: Road bridge lower deck: Railroad (railway) bridge |
Structure: |
main span: Through truss bridge main span: Truss bridge with suspended deck |
Location
Location: |
Kremenchuk, Poltava Oblast, Ukraine |
---|---|
Crosses: |
|
Coordinates: | 49° 3' 11.05" N 33° 25' 25" E |
Technical Information
Dimensions
main span | 82 m | |
total length | 1.2 km | |
number of lanes | 2 |
Materials
piers |
reinforced concrete
|
---|---|
truss |
steel
|
Participants
Currently there is no information available about persons or companies having participated in this project.
Relevant Web Sites
There currently are no relevant websites listed.
Relevant Publications
- Bridge Engineering in Ukraine. In: (2013): Handbook of International Bridge Engineering. CRC Press, Boca Raton (USA), ISBN 978-1439810293, pp. 889. (2013):
- About this
data sheet - Structure-ID
20013139 - Published on:
30/08/2004 - Last updated on:
06/03/2022