General Information
Name in local language: | Talbrücke Krondorf |
---|---|
Status: | project phase |
Project Type
Function / usage: |
Motorway bridge / freeway bridge |
---|---|
Material: |
Prestressed concrete bridge |
Structure: |
Box girder bridge |
Support conditions: |
for registered users |
Material: |
Structurae Plus/Pro - Subscribe Now! |
Location
Location: |
Krondorf, Velburg, Neumarkt in der Oberpfalz (Kreis), Bavaria, Germany |
---|---|
Carries: |
|
Carries: |
A 3 Motorway (Germany) (1984)
|
To replace: |
Krondorf Bridge (1971)
|
Coordinates: | 49° 15' 43.89" N 11° 36' 17.95" E |
Technical Information
Dimensions
total length | 455 m | |
span lengths | 30 m - 47.50 m - 5 x 60.00 m - 47.50 m - 30 m | |
number of spans | 9 | |
bridge surface | 14 150.50 m² | |
number of lanes | 2 x 2 | |
crossing angle | 100 gon | |
deck | total width | 31.1 m |
pier 50 | height | 35.677 m |
pier 60 | height | 36.128 m |
pier 70 | height | 36.578 m |
Design Loads
design code(s) | DIN EN 1991 + NA | |
military load class | 50/50 + 100 |
Materials
superstructure |
prestressed concrete
|
---|---|
piers |
reinforced concrete
|
abutments |
reinforced concrete
|
Participants
Relevant Web Sites
There currently are no relevant websites listed.
- About this
data sheet - Structure-ID
20079591 - Published on:
28/06/2020 - Last updated on:
01/09/2020