General Information
Name in local language: | Talbrücke Krondorf |
---|---|
Completion: | 1971 |
Status: | in use |
Project Type
Structure: |
Box girder bridge |
---|---|
Function / usage: |
Motorway bridge / freeway bridge |
Material: |
Prestressed concrete bridge Structurae Plus/Pro - Subscribe Now! |
Location
Location: |
Krondorf, Velburg, Neumarkt in der Oberpfalz (Kreis), Bavaria, Germany |
---|---|
Carries: |
|
Part of: | |
Will be replaced by: |
Krondorf Bridge
|
Coordinates: | 49° 15' 44.40" N 11° 36' 17.72" E |
Technical Information
Dimensions
height | 40 m | |
total length | 475 m | |
number of spans | 9 | |
bridge surface | 7 125 m² | |
number of lanes | 2 x 2 | |
deck | deck depth | 4 m |
Design Loads
live load | Brückenklasse 60 | |
design code(s) | DIN 1072 |
Cost
cost of construction | German Mark 8 000 000 |
Materials
superstructure |
prestressed concrete
|
---|---|
piers |
reinforced concrete
|
abutments |
reinforced concrete
|
Participants
Relevant Web Sites
There currently are no relevant websites listed.
- About this
data sheet - Structure-ID
20009111 - Published on:
21/04/2003 - Last updated on:
28/06/2020