0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

General Information

Beginning of works: 1891
Completion: 27 September 1893
Status: destroyed (21 April 1945)

Project Type

Location

Location: , , ,
Crossed:
  • Neckar River
Replaced by: König-Karls-Brücke (1948)

Technical Information

Dimensions

length 300 m

Cost

cost of construction 1 300 000 Mark

Materials

arches steel

Chronology

21 April 1945

The bridge is blown up by German troops.

Participants

Relevant Web Sites

There currently are no relevant websites listed.

  • About this
    data sheet
  • Structure-ID
    20006251
  • Published on:
    15/10/2002
  • Last updated on:
    05/01/2022
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine