General Information
Status: | in use |
---|
Project Type
Structure: |
Box girder bridge |
---|---|
Construction method: |
Incremental launching |
Material: |
Prestressed concrete bridge |
Function / usage: |
Road bridge |
Plan view: |
Structurae Plus/Pro - Subscribe Now! |
Support conditions: |
for registered users |
Material: |
Structurae Plus/Pro - Subscribe Now! |
Location
Technical Information
Dimensions
total length | 300 m |
Materials
deck |
prestressed concrete
|
---|---|
piers |
reinforced concrete
|
abutments |
reinforced concrete
|
Participants
Contracts management
- Kevin Banks (contracts manager)
Structural engineering
Contractor
Resident engineering
- Koos Conradie (resident engineer)
Prestressing
Relevant Web Sites
There currently are no relevant websites listed.
- About this
data sheet - Structure-ID
20007907 - Published on:
28/01/2003 - Last updated on:
11/12/2017