General Information

Beginning of works: April 1995
Completion: March 1998
Duration of works: 39 months
Status: in use

Project Type

Location

Location: , , ,
Address: B29
Crosses:
  • Kocher River
Coordinates: 48° 52' 54.19" N    10° 5' 41.21" E
Show coordinates on a map

Technical Information

Dimensions

total length 311.20 m
span lengths 25.60 m - 34.00 m - 48.00 m - 2 x 60.00 m - 48.00 m - 35.60 m
number of spans 7
bridge surface 4 600 m²
deck deck width 13.10 - 18.95 m
girder depth 1.70 - 3.00 m
piles diameter 1.25 m
number 71

Quantities

abutments concrete volume 700.00 m³
reinforcing steel 32.00 t
deck concrete volume 3 905.00 m³
reinforcing steel 375.00 t
piers concrete volume 303.00 m³
reinforcing steel 140.00 t

Design Loads

live load Brückenklasse 60/30
design code(s) DIN 1072

Cost

cost of construction German Mark 11 500 000

Materials

deck prestressed concrete
piers reinforced concrete
abutments reinforced concrete

Relevant Web Sites

There currently are no relevant websites listed.

Relevant Publications

  • About this
    data sheet
  • Structure-ID
    20001180
  • Published on:
    17/12/2000
  • Last updated on:
    26/04/2016
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine