General Information
Project Type
Function / usage: |
Road tunnel |
---|---|
Structure: |
Tunnel |
Construction method: |
Wall-cover construction method Cut-and-cover method |
Location
Location: |
Düsseldorf-Stadtmitte, Düsseldorf, North Rhine-Westphalia, Germany |
---|---|
Address: | Hofgartenstraße / Elberfelder Straße / Berliner Allee / Immermannstraße |
Replaces: |
Jan-Wellem-Platz Elevated Road (1962)
|
Connects to: |
Kö-Bogen (2013)
|
Coordinates: | 51° 13' 44.53" N 6° 46' 52.14" E |
Coordinates: | 51° 13' 35.06" N 6° 46' 41.17" E |
Coordinates: | 51° 13' 28.68" N 6° 46' 58.52" E |
Coordinates: | 51° 13' 31.21" N 6° 47' 3.74" E |
Technical Information
There currently is no technical data available.
Participants
Owner
Object planning
Contractor
Concrete supplier
Relevant Web Sites
There currently are no relevant websites listed.
Relevant Publications
- Projekt Kö-Bogen in Düsseldorf - Beeinflussung der Hochstraße "Tausendfüßler" durch eine tiefe Baugrube sowie durch die Unterfahrung mittels TVM. In: Bautechnik, v. 89, n. 9 (September 2012), pp. 600-609. (2012):
- About this
data sheet - Structure-ID
20037082 - Published on:
13/05/2008 - Last updated on:
28/05/2021