0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

General Information

Beginning of works: 1969
Completion: 1974
Status: in use

Project Type

Function / usage: Road bridge
Structure: Girder bridge
Construction method: Balanced cantilever method
Material: Prestressed concrete bridge

Location

Location: , ,
, ,
Crosses:
  • Fraser River
Replaces: Fraser Avenue/Street Bridge (1894)
Coordinates: 49° 12' 7.88" N    123° 4' 38.98" W
Show coordinates on a map

Technical Information

Dimensions

length 1 450 m
number of lanes 6

Cost

cost of construction Canadian dollar 15 000 000

Materials

deck prestressed concrete

Participants

Currently there is no information available about persons or companies having participated in this project.

Relevant Web Sites

Relevant Publications

  • About this
    data sheet
  • Structure-ID
    20005904
  • Published on:
    03/10/2002
  • Last updated on:
    05/02/2016
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine