0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

General Information

Name in local language: Talbrücke Klöffelsberg
Official designation: BW 622a
Beginning of works: Spring 2015
Completion: Fall 2018
Status: in use

Project Type

Location

Location: , , ,
Carries: A 7 Motorway (Germany)
Coordinates: 50° 6' 40.07" N    9° 57' 30.95" E
Show coordinates on a map

Technical Information

Dimensions

total length 344.0 m
span lengths 37.00 m - 6 x 45.00 m - 37.00 m
number of spans 8
bridge surface 11 730 m²
height above valley floor or water max. 22 m
total width 34.10 m
roadway / carriageway width 12.00 m + 15.00 m
piles diameter 1.20 m
superstructure deck depth 3.00 m

Quantities

concrete volume 16 800 m³
prestressing steel 501 t
reinforcing steel 2 617 t
piles total length of piles 2 645 m

Cost

cost of construction ca. Euro 28 000 000

Materials

superstructure prestressed concrete
piers reinforced concrete
abutments reinforced concrete

Relevant Web Sites

There currently are no relevant websites listed.

Relevant Publications

  • Wellner, Sabine (2019): Chronik des Brückenbaus. Presented at: 29. Dresdener Brückenbausysmposium, 11./12. März 2019, Dresden (Germany), pp. 197-208.
  • About this
    data sheet
  • Structure-ID
    20077193
  • Published on:
    04/04/2019
  • Last updated on:
    04/04/2019
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine