General Information
Name in local language: | Talbrücke Klöffelsberg |
---|---|
Official designation: | BW 622a |
Beginning of works: | Spring 2015 |
Completion: | Fall 2018 |
Status: | in use |
Project Type
Function / usage: |
Motorway bridge / freeway bridge |
---|---|
Structure: |
Box girder bridge |
Material: |
Prestressed concrete bridge |
Construction method: |
Incremental launching |
Material: |
Structurae Plus/Pro - Subscribe Now! |
Location
Location: |
Elfershausen, Bad Kissingen (Kreis), Bavaria, Germany |
---|---|
Carries: |
A 7 Motorway (Germany)
|
Coordinates: | 50° 6' 40.07" N 9° 57' 30.95" E |
Technical Information
Dimensions
total length | 344.0 m | |
span lengths | 37.00 m - 6 x 45.00 m - 37.00 m | |
number of spans | 8 | |
bridge surface | 11 730 m² | |
height above valley floor or water | max. 22 m | |
total width | 34.10 m | |
roadway / carriageway width | 12.00 m + 15.00 m | |
piles | diameter | 1.20 m |
superstructure | deck depth | 3.00 m |
Quantities
concrete volume | 16 800 m³ | |
prestressing steel | 501 t | |
reinforcing steel | 2 617 t | |
piles | total length of piles | 2 645 m |
Cost
cost of construction | ca. Euro 28 000 000 |
Materials
superstructure |
prestressed concrete
|
---|---|
piers |
reinforced concrete
|
abutments |
reinforced concrete
|
Participants
Owner
Client
Design
Structural engineering
Contractor
Relevant Web Sites
There currently are no relevant websites listed.
Relevant Publications
- Chronik des Brückenbaus. Presented at: 29. Dresdener Brückenbausysmposium, 11./12. März 2019, Dresden (Germany), pp. 197-208. (2019):