General Information
Completion: | 2002 |
---|---|
Status: | in use |
Project Type
Structure: |
Through truss bridge |
---|---|
Function / usage: |
Road bridge |
Structure: |
Covered bridge |
Material: |
Timber bridge |
Location
Technical Information
Dimensions
Initial construction | ||
---|---|---|
span | 42 m | |
Reconfiguration | ||
total length | 85 m |
Materials
truss |
wood
|
---|
Participants
Reconfiguration (2006)
Relevant Web Sites
There currently are no relevant websites listed.
Relevant Publications
- Lechtal, Tal der Holzbrücken. Methodisches Vorgehen beim Entwurf. In: Brückenbau, v. 1, n. 3 ( 2009), pp. 6-9. (2009):
- About this
data sheet - Structure-ID
20052053 - Published on:
14/01/2010 - Last updated on:
05/02/2016