General Information
Other name(s): | North Bisan-Seto Bridge |
---|---|
Completion: | 1985 |
Status: | in use |
Project Type
Structure: |
Three-span suspension bridge |
---|---|
Material: |
Steel bridge |
Plan view: |
Structurae Plus/Pro - Subscribe Now! |
Support conditions: |
for registered users |
Construction method: |
Structurae Plus/Pro - Subscribe Now! |
Material: |
Structurae Plus/Pro - Subscribe Now! |
Secondary structure(s): |
Structurae Plus/Pro - Subscribe Now! |
Function / usage: |
upper deck: Motorway bridge / freeway bridge lower deck: Railroad (railway) bridge |
Location
Location: |
Sakaide, Kagawa, Japan |
---|---|
Part of: | |
Coordinates: | 34° 23' 7.42" N 133° 49' 6.05" E |
Coordinates: | 34° 22' 17.63" N 133° 49' 24.66" E |
Technical Information
Dimensions
main span | 990.0 m | |
length of side spans | 2 x 274.0 m | |
sag | 90.0 m | |
total length | 1 610.7 m | |
clearance | 65.0 m | |
pylon | pylon height | 161.1 m |
Materials
cables |
steel
|
---|---|
pylons |
steel
|
deck truss |
steel
|
Participants
Relevant Web Sites
There currently are no relevant websites listed.
Relevant Publications
- Aesthetic design on the Seto Ohashi Bridge. Presented at: IABSE Colloquium: Interaction between Major Engineering Structures and the Marine Environment, Nyborg, Denmark, 1991, pp. 143-150. (1991):
- Bridge Engineering Handbook. CRC Press, Boca Raton (USA), pp. 66-26. (1999):
- Bridges - Ponts - Brücken. Atrium, Mexico City (Mexico), pp. 126-131. (2002):
- Honshu-Sikoku Bridge (Kojima-Sakaide Route) Cables Erection of 4A Center Anchorage on South & North Bisanseto Bridges. In: 土木学会論文集 (Doboku Gakkai rombunshū), v. 1987, n. 379 (March 1987), pp. 25-28. (1987):
- (2015): Improvement of Dry Air Injection System for main cables of Seto- Ohashi Bridges. Presented at: IABSE Conference: Structural Engineering: Providing Solutions to Global Challenges, Geneva, Switzerland, September 2015, pp. 1400-1407.
- About this
data sheet - Structure-ID
20001332 - Published on:
18/02/2001 - Last updated on:
12/02/2016