• DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Kirchenfeld Bridge

General Information

Name in local language: Kirchenfeldbrücke
Beginning of works: 15 December 1881
Completion: 24 September 1883
Duration of works: 21 months
Status: in use

Project Type

Structure: Deck arch bridge
Truss arch bridge
Function / usage: Road bridge
Material: Steel bridge

Location

Location: , ,
Crosses:
  • Aare River
Coordinates: 46° 56' 44.94" N    7° 26' 54.81" E
Show coordinates on a map

Technical Information

Dimensions

main span 2 x 78 m
width 13.2 m
total length 229 m
total length 229 m
height above valley floor or water 37 m
arches rise 22 m

Cost

cost of construction Swiss Franc 1 250 000

Materials

arches steel
piers on arch steel

Advertisement

Participants

Currently there is no information available about persons or companies having participated in this project.

Relevant Web Sites

There currently are no relevant websites listed.

  • About this
    data sheet
  • Structure-ID
    20017322
  • Date created
    16/08/2005
  • Last Update
    16/02/2020