0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

General Information

Beginning of works: 15 June 2021
Completion: 21 September 2021
Status: in use

Project Type

Location

Location: , ,
Location description: The bridge crosses the Kigoya river.
Coordinates: 2° 19' 33.91" S    29° 9' 54.08" E
Show coordinates on a map

Technical Information

Dimensions

span 64 m

Materials

cables steel wire
deck steel
anchorages reinforced concrete

Notes

The bridge built by Bridges to Prosperity serves around 2825 people in the communities of Kigandi-Bizi-Murambi-Karambi Villages.

Participants

Relevant Web Sites

There currently are no relevant websites listed.

  • About this
    data sheet
  • Structure-ID
    20084722
  • Published on:
    27/01/2023
  • Last updated on:
    27/01/2023
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine