General Information
Project Type
Function / usage: |
High-speed rail tunnel |
---|---|
Structure: |
Tunnel with segmental lining |
Location
Location: |
Efringen-Kirchen, Lörrach (Kreis), Baden-Württemberg, Germany Schliengen, Lörrach (Kreis), Baden-Württemberg, Germany |
---|---|
Part of: | |
Coordinates: | 47° 44' 32.03" N 7° 33' 36.57" E |
Coordinates: | 47° 39' 30.10" N 7° 34' 31.80" E |
Technical Information
Dimensions
total length | 9 385 m | |
length of bored tunnels | 2 x 8 984 m | |
length of cut-and-cover section | 286 m / 115 m | |
tube | tunnel section area | ca. 90 m² |
interior diameter | 9.4 m |
Participants
Owner
Design
Co-contractor
Subcontractor
Construction supervision
Relevant Web Sites
There currently are no relevant websites listed.
Relevant Publications
- Construction of the Katzenberg Tunnel by Two Tunnel Boring Machines. In: (2008): The Austrian Art of Tunnelling. Wilhelm Ernst & Sohn Verlag für Architektur und technische Wisenschaften GmBH und Co. KG, Berlin (Germany), ISBN 978-3-433-02924-4, pp. 124-126. (2008):
- Geophysikalische Vorauserkundung von Verkarstungs- und Störungszonen bei der TVM-Auffahrung des Katzenbergtunnels. In: Geomechanik und Tunnelbau, v. 1, n. 5 ( 2008), pp. 450-459. (2008):
- Katzenberg tunnel - environmental and approval constraints on the recycling of tunnel spoil material / Katzenbergtunnel - umwelttechnische und genehmigungsrechtliche Randbedingungen für die Verwertung von Tunnelausbruchmaterial. In: Geomechanics and Tunnelling, v. 2, n. 5 ( 2009), pp. 643-651. (2009):
- Prozess Controlling zur Klärung der Risikosphäre bei den Vortrieben des Katzenbergtunnels. In: Felsbau, v. 25, n. 5 ( 2007), pp. 153. (2007):
- About this
data sheet - Structure-ID
20015199 - Published on:
07/02/2005 - Last updated on:
15/12/2021