General Information
Completion: | May 2008 |
---|---|
Status: | in use |
Project Type
Structure: |
Box girder bridge |
---|---|
Function / usage: |
Road bridge |
Construction method: |
Balanced cantilever method |
Material: |
Prestressed concrete bridge |
Location
Location: |
Kuala Lumpur, Kuala Lumpur, Malaysia |
---|---|
Coordinates: | 3° 8' 20.07" N 101° 43' 12.99" E |
Technical Information
Dimensions
total length | 568 m | |
number of spans | 12 | |
deck | girder depth | 2.4 - 3.2 m |
Section 1 | total length | 192.0 m |
span lengths | 40.0 m - 2 x 56.0 m - 40.0 m | |
Section 2 | total length | 240.0 m |
span lengths | 40.0 m - 2 x 56.0 m - 48.0 m - 40.0 m | |
Section 3 | total length | 136.0 m |
span lengths | 40.0 m - 56.0 m - 40.0 m |
Materials
deck |
prestressed concrete
|
---|
Participants
Owner
Structural design
Structural engineering
- VE Consult Sdh Bhd (foundations)
Main contractor
Prestressing
Construction management
Relevant Web Sites
There currently are no relevant websites listed.
Relevant Publications
- Kampong Pandan Flyover, Kuala Lumpur, Malaysia. In: Structural Engineering International, v. 19, n. 1 (February 2009), pp. 63-66. (2009):
- About this
data sheet - Structure-ID
20049503 - Published on:
08/12/2009 - Last updated on:
26/05/2017