General Information
Name in local language: | Kampmannbrücke |
---|---|
Beginning of works: | Summer 2016 |
Completion: | 20 December 2019 |
Status: | in use |
Project Type
Structure: |
Cable-stayed bridge with fan system Two-span cable-stayed bridge |
---|---|
Function / usage: |
Road bridge |
Material: |
Steel-reinforced concrete composite bridge Structurae Plus/Pro - Subscribe Now! |
Secondary structure(s): |
Structurae Plus/Pro - Subscribe Now! |
Location
Location: |
Essen, North Rhine-Westphalia, Germany |
---|---|
Address: | K 3 |
Crosses: |
|
Replaces: |
Kampmann Bridge (1951)
|
Coordinates: | 51° 23' 52.30" N 7° 4' 45.05" E |
Technical Information
Dimensions
total length | 173 m | |
vertical navigation clearance | 4.7 m | |
horizontal navigation clearance | 20 m | |
deck | width | 11.7 m |
roadway / carriageway width | 2 x 3.25 m | |
walkway width | 3.5 m | |
pylons | pylon height (above water) | 27 m |
pylon height (above deck) | 22 m |
Design Loads
live load | LM 1 (DIN Fachbericht 2009) |
Cost
cost of construction | Euro 12 544 300 |
Materials
pylons |
steel
|
---|---|
deck of main bridge |
composite steel-reinforced concrete
|
abutments |
reinforced concrete
|
Participants
Owner
Object planning
Design
Structural engineering
Geotechnical engineering
Checking engineering
- Jürgen Uhlendahl (checking engineer)
Co-contractor
Steel construction