0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

General Information

Beginning of works: 24 February 2020
Completion: 21 March 2024
Status: in use

Project Type

Function / usage: Road bridge
Support conditions:
Structure: Two-span single-pylon cable-stayed bridge
Plan view: Structurae Plus/Pro - Subscribe Now!
Material: Steel-concrete hybrid bridge
Construction method: pylons:
Climbing formwork
Secondary structure(s): Structurae Plus/Pro - Subscribe Now!
Secondary structure(s): Structurae Plus/Pro - Subscribe Now!

Location

Location: , ,
Crosses:
  • Elbe River
Coordinates: 52° 7' 35.86" N    11° 39' 5.09" E
Show coordinates on a map

Technical Information

Dimensions

main span 163.57 m
width 27.10 m
total length 247.99 m
span lengths 50 m - 163.57 m - 34 m
number of spans 3
piles diameter 1.50 m
pylons height 63 m
number 2

Quantities

substructure concrete volume 3 200 m³

Materials

deck of main span steel
pylons reinforced concrete (C 50/60)
deck of side spans reinforced concrete
piles reinforced concrete
abutments reinforced concrete

Relevant Web Sites

There currently are no relevant websites listed.

Relevant Publications

  • About this
    data sheet
  • Structure-ID
    20089454
  • Published on:
    19/09/2024
  • Last updated on:
    19/09/2024
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine