General Information
Project Type
Function / usage: |
Road bridge |
---|---|
Support conditions: |
for registered users |
Structure: |
Two-span single-pylon cable-stayed bridge |
Plan view: |
Structurae Plus/Pro - Subscribe Now! |
Material: |
Steel-concrete hybrid bridge |
Construction method: |
pylons: Climbing formwork |
Secondary structure(s): |
Structurae Plus/Pro - Subscribe Now! |
Secondary structure(s): |
Structurae Plus/Pro - Subscribe Now! |
Location
Location: |
Magdeburg, Saxony-Anhalt, Germany |
---|---|
Crosses: |
|
Coordinates: | 52° 7' 35.86" N 11° 39' 5.09" E |
Technical Information
Dimensions
main span | 163.57 m | |
width | 27.10 m | |
total length | 247.99 m | |
span lengths | 50 m - 163.57 m - 34 m | |
number of spans | 3 | |
piles | diameter | 1.50 m |
pylons | height | 63 m |
number | 2 |
Quantities
substructure | concrete volume | 3 200 m³ |
Materials
deck of main span |
steel
|
---|---|
pylons |
reinforced concrete
(C 50/60)
|
deck of side spans |
reinforced concrete
|
piles |
reinforced concrete
|
abutments |
reinforced concrete
|
Participants
Owner
- Abwassergesellschaft Magdeburg
- Landeshauptstadt Magdeburg
- Städtische Werke Magdeburg
- Wasserstraßen- und Schifffahrtsverwaltung des Bundes
General designers
Traffic engineering
Structural engineering
Checking engineering
- Michael Müller (checking engineer)
Co-contractor
Stay cables
Construction management
Construction supervision
Relevant Web Sites
There currently are no relevant websites listed.
Relevant Publications
- Ersatzneubau des Strombrückenzugs Magdeburg. Anlass, Planung und Errichtung. In: Brückenbau, v. 16, n. 4 ( 2024), pp. 20-28. (2024):
- Ersatzneubau Strombrückenzug Magdeburg. In: Bautechnik, v. 101, n. 2 (February 2024), pp. 105-114. (2024):
- Ersatzneubau Strombrückenzug Magdeburg – Entwurf, Konstruktion und Ausführung (Teil 1). In: Stahlbau, v. 90, n. 10 (October 2021), pp. 759-765. (2021):