0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

General Information

Beginning of works: 2013
Completion: 5 January 2020
Status: under construction

Project Type

Structure: Tunnel
Function / usage: Metro tunnel / subway tunnel
Construction method: Cut-and-cover method

Location

Location: , ,
Part of:
Coordinates: 22° 19' 52.28" N    114° 12' 0.52" E
Coordinates: 22° 19' 31.56" N    114° 11' 25.68" E
Show coordinates on a map

Technical Information

There currently is no technical data available.

Relevant Web Sites

There currently are no relevant websites listed.

  • About this
    data sheet
  • Structure-ID
    20070953
  • Published on:
    10/03/2016
  • Last updated on:
    27/12/2019
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine