0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

General Information

Beginning of works: 15 March 2023
Completion: 7 July 2023
Status: in use

Project Type

Location

Location: , ,
Location description: The bridge crosses the Kiraga river.
Coordinates: 2° 14' 0" S    29° 26' 0" E
Show coordinates on a map

Technical Information

Dimensions

span 77 m

Materials

cables steel wire

Notes

The bridge built by Bridges to Prosperity serves around 5357 people in the communities of Nyamugwagwa-Murengezo(Kaduha-Karambo).

Participants

Relevant Web Sites

There currently are no relevant websites listed.

  • About this
    data sheet
  • Structure-ID
    20088211
  • Published on:
    11/04/2024
  • Last updated on:
    07/12/2024
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine