0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

General Information

Beginning of works: 1997
Completion: 1998
Status: in use

Project Type

Structure: Half-through arch bridge
Material: Steel bridge
Function / usage: Road bridge

Location

Location: , , ,
, , ,
Address: C-43
Crosses:
  • Júcar River
Coordinates: 39° 9' 45.57" N    0° 26' 10.17" W
Show coordinates on a map

Technical Information

Dimensions

main span 103.80 m

Materials

arches steel

Participants

Design
Co-contractor
Steel construction

Relevant Web Sites

  • About this
    data sheet
  • Structure-ID
    20022798
  • Published on:
    17/09/2006
  • Last updated on:
    29/06/2020
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine